New-construction window installs for builders and GCs.

Nailing-fin windows, installed to your schedule.

Existing-home work? Window replacement. Patio doors? Sliding glass doors.

Clearview job photo — new build with windows set

Installation sequence

From plans to set day.

We verify the opening schedule, provide project pricing and lead time, then install to your sequence.

Contractor registration

Clearview Windows & Trim LLC · WA UBI 605 779 798 · L&I CLEARVW74601. Verify registration.

For project pricing

Send plans or a window schedule.

We price the full scope and flag missing or conflicting specs before ordering.

Include

  • Opening count, sizes, and styles
  • Brand, finish, and required glass or code specs
  • Target set date and site contact

Window and glass options

Opening requirements

Prep and flashing.

Rough opening

Follow the unit spec. Frame within 1/4″ of square, corner to corner.

Weather barrier

Sheathing and properly lapped WRB must be complete before installation. No bare, unwrapped openings.

Flashing sequence

Sill, side, and head flashing tie the window into the WRB.

Two-story new construction wrapped in weather-resistant barrier with windows set and an open garage bay, ready for sidingCLEARVIEW JOB PHOTO

What to look for

Lap each layer to shed water.

Reference detail; verify against unit specs and project requirements.

01
SILL

Sill pan first; maintain drainage to the exterior.

02
SIDES

Tie side flashing into the window and WRB.

03
TOP

Lap head flashing over the WRB.

Verify the installation against project specs.Conditions vary by unit and wall assembly.
Clearview installation photo — actual company work. See more project photos.

Project sequence

From schedule to handoff.

  1. Plans and schedule. Send plans or the opening schedule. We verify sizes, styles, and count before pricing.
  2. Quote and lead time. Receive one written project price and the manufacturer lead time.
  3. Framing check. We confirm rough openings match the approved schedule before set day.
  4. Window set. We install after sheathing and WRB, ahead of siding or stucco.
  5. Walk-through. We review the openings with your superintendent or PM and release the elevation to the next trade.

Before set day

Site ready. Schedule confirmed.

  • Rough openings match the approved schedule
  • Sheathing and WRB are complete; access is clear
  • Superintendent or PM is available for schedule changes
  • Siding, stucco, or EIFS follows our walk-through
  • Openings and flashing are dry on install day

Scope

Clearview / Builder

Clearview

  • Verify openings against the schedule before ordering
  • Order units and track manufacturer lead times
  • Set, shim, and flash the windows
  • Integrate flashing with the weather-resistive barrier
  • Walk the openings with your superintendent or PM

Builder / GC

  • Frame to the approved rough-opening sizes
  • Complete sheathing and WRB before installation
  • Provide safe, clear access to each opening
  • Notify us of schedule or sequence changes
  • Schedule siding, stucco, or EIFS after the walk-through

We price schedule changes and out-of-scope work before proceeding.

Completed work

Installed and ready for the next trade.

See a recent new-construction installation.

Two-story new construction wrapped in weather-resistant barrier with windows set and an open garage bay, ready for siding
Set and flashed, two-story new buildNew construction
Multiple black-framed windows set into a modern new-construction home with tan panel siding and exposed weather barrier at the base
Corner windows set, new buildNew construction

Request pricing

Send plans or request an estimate.

  1. Email plans or schedule. Marked-up elevations welcome.owner@windowsbyclearveiw.com.
  2. Use the form. Choose "Builder or GC" and add the city, opening count, and target date.Request pricing.

Written price and lead time before ordering.

Next step

Price your next window package.

Send the plans or schedule for project pricing and lead time.